Igni
Cambridge · MALive now

Cambridge building & ADU permits

Recent permit activity, updated continuously.

Cambridge sits across the Charles River from Boston and is home to Harvard and MIT. Under the 2024 Affordable Homes Act, ADUs are now allowed by right across Massachusetts; Cambridge publishes its new-construction permits under a public-domain (PDDL) license, which Igni ingests and classifies.

Igni is tracking 247 residential and building permits in Cambridge, MA — including 1 classified accessory-dwelling-unit (ADU) filing. The most active ZIP is 02138. The most recent filing Igni tracked was Oct 29, 2026. All records come from data.cambridgema.gov (Socrata), an official government open-data feed, and are refreshed continuously.

247

Permits tracked

1

ADU permits

5

Distinct ZIP codes

Oct 29, 2026

Newest permit

Recent permits

A sample of the freshest permits in this jurisdiction — ZIP and city only (no street addresses).

ZIPPermit typeADU typeValuationApplied
02140Residential—$695,000Aug 25, 2026
02140Residential—$2,525,000May 14, 2026
02140Residential—$707,000Aug 25, 2026
02138Residential—$680,000Aug 21, 2026
02138Commercial—$9,975,000Jun 16, 2026
02140Residential—$800,000Apr 13, 2026
02140Residential—$800,000Apr 13, 2026
02141Residential—$0Oct 1, 2026
02140Residential—$800,000Apr 13, 2026
02140Residential—$720,000Apr 13, 2026
02140Residential—$800,000Apr 10, 2026
02138Residential—$1,898,000Mar 27, 2026
02140Residential—$2,373,166Mar 10, 2026
02138Residential—$260,000Jul 8, 2026
02139Residential—$1,290,000Dec 10, 2025
02140Residential—$2,703,997Aug 1, 2026
02141Residential—$2,268,600Jun 1, 2026
02139Residential—$850,000May 18, 2026
02139Residential—$850,000May 18, 2026
02138Residential—$1,000,000Dec 3, 2025

Top ZIP codes by recent activity

02138870213965021405702141240214214

Permit activity in Cambridge

Igni counted 65 permits issued in Cambridge over the last 12 months (Oct 2025 – Sep 2026).

Monthly permits issued in CambridgeMonthly all permits issued in Cambridge from Oct 2023 to Sep 2026, between 0 and 14 a month.051015202420252026Oct 2023: 2 permitsNov 2023: 3 permitsDec 2023: 10 permitsJan 2024: 4 permitsFeb 2024: 0 permitsMar 2024: 5 permitsApr 2024: 4 permitsMay 2024: 2 permitsJun 2024: 3 permitsJul 2024: 5 permitsAug 2024: 1 permitsSep 2024: 3 permitsOct 2024: 8 permitsNov 2024: 2 permitsDec 2024: 2 permitsJan 2025: 6 permitsFeb 2025: 1 permitsMar 2025: 3 permitsApr 2025: 0 permitsMay 2025: 3 permitsJun 2025: 1 permitsJul 2025: 3 permitsAug 2025: 2 permitsSep 2025: 2 permitsOct 2025: 2 permitsNov 2025: 0 permitsDec 2025: 5 permitsJan 2026: 4 permitsFeb 2026: 5 permitsMar 2026: 5 permitsApr 2026: 2 permitsMay 2026: 5 permitsJun 2026: 14 permitsJul 2026: 10 permitsAug 2026: 6 permitsSep 2026: 7 permits
Monthly permits

Forecast hidden — not accurate enough for this series. How we forecast

Permits issued per 12 months by permit type, with the year-over-year change.
Permit typeLast 12 monthsYear over year
All permits65—
Residential building61—
Commercial building2—
Trade (electrical, plumbing, mechanical)0—
ADU1—
Monthly figures
Monthly all permits issued in Cambridge; provisional months may still rise as the city publishes late records.
MonthPermits10th–90th percentile
Oct 20232—
Nov 20233—
Dec 202310—
Jan 20244—
Feb 20240—
Mar 20245—
Apr 20244—
May 20242—
Jun 20243—
Jul 20245—
Aug 20241—
Sep 20243—
Oct 20248—
Nov 20242—
Dec 20242—
Jan 20256—
Feb 20251—
Mar 20253—
Apr 20250—
May 20253—
Jun 20251—
Jul 20253—
Aug 20252—
Sep 20252—
Oct 20252—
Nov 20250—
Dec 20255—
Jan 20264—
Feb 20265—
Mar 20265—
Apr 20262—
May 20265—
Jun 202614—
Jul 202610—
Aug 20266—
Sep 20267—

Counts are permits issued per calendar month as Cambridge publishes them to its open-data feed — not a complete census; a change in what the city publishes moves them too. The current month is left out, and the most recent months are provisional. A forecast is a statistical estimate with a range, not a prediction for any project. Informational only.

How long do permits take in Cambridge?

Based on 127 Cambridge permits applied for between Nov 2023 and Aug 2026, the typical (median) permit was issued 111 days after application, and the middle half of permits took 60–186 days. One in ten took longer than 248 days.

Median and typical range (25th–75th percentile) in calendar days from application to issuance, by permit type. Segments with fewer than 30 permits are not shown.
Permit typeMedianTypical rangePermits
All permits111 days60–186 days127
Residential building118 days60–189 days112

Typical, not guaranteed: individual permits vary with project scope, application completeness and plan-review workload. Days are calendar days from application to issuance; applications still pending are counted as not-yet-issued rather than dropped. Informational only, not legal advice. How we calculate approval times.

Housing law — Massachusetts

Massachusetts legalized accessory dwelling units by right statewide through the Affordable Homes Act (2024); as of February 2025, an ADU up to 900 sq ft is allowed by right in single-family zoning districts in nearly every community, without an owner-occupancy requirement.

The MBTA Communities Act (2021) requires the 177 MBTA-served cities and towns to zone for multifamily housing as of right near transit; the state's highest court upheld the law as constitutional and enforceable in 2025.

Affordable Homes Act — statewide ADUs (2024)MBTA Communities Act (2021)

Data source

Sourced from data.cambridgema.gov (Socrata). PDDL — public domain.

Nearby cities — Massachusetts

Learn more about ADUs & building permits

Background reading on accessory dwelling units, building permits, and how Igni turns Cambridge permit records into leads.

Cambridge permit data — FAQ

Where does Igni get Cambridge permit data?

Cambridge permit data is sourced directly from data.cambridgema.gov (Socrata) — an official government open-data feed (PDDL — public domain). Igni normalizes it and classifies ADU activity.

How fresh is Cambridge permit data?

Igni refreshes Cambridge permits continuously from the source feed, typically within about a day of filing. Headline counts reflect all permits Igni has tracked for this jurisdiction; the table shows the most recent activity.

How long does it take to get a building permit in Cambridge?

Based on 127 Cambridge permits applied for between Nov 2023 and Aug 2026, the typical (median) time from application to issuance was 111 days. The middle half of permits were issued in 60–186 days. Median by permit type: residential building permits 118 days. These are calendar days from historical records — typical, not guaranteed; individual permits vary with scope, completeness and review workload. Not legal advice.

Does Cambridge allow accessory dwelling units (ADUs)?

Massachusetts legalized accessory dwelling units by right statewide through the Affordable Homes Act (2024); as of February 2025, an ADU up to 900 sq ft is allowed by right in single-family zoning districts in nearly every community, without an owner-occupancy requirement.

Get permit leads — Cambridge

Fresh, filterable residential and ADU permit leads from Cambridge — delivered before your competitors even know.

Informational only, not legal advice. Headline counts reflect all permits Igni has tracked for this jurisdiction; the table shows recent activity. Housing law changes — verify current statutes before relying on this.