Campbell building & ADU permits

Recent permit activity, updated continuously.

Campbell is a small Santa Clara County city between San Jose and Los Gatos in Silicon Valley. Its building division files ADUs under dedicated work types — detached, attached, garage conversion and legalization of an existing unit — so each kind of ADU project is visible in the permit record.

Igni is tracking 199 residential and building permits in Campbell, CA — including 8 classified accessory-dwelling-unit (ADU) filings. The most active ZIP is 95008. The most recent filing Igni tracked was Sep 25, 2026. All records come from City of Campbell (MyGovernmentOnline / ArcGIS), an official government open-data feed, and are refreshed continuously.

199

Permits tracked

8

ADU permits

4

Distinct ZIP codes

Sep 25, 2026

Newest permit

Recent permits

A sample of the freshest permits in this jurisdiction — ZIP and city only (no street addresses).

ZIPPermit typeADU typeValuationApplied
95008Residential——Aug 21, 2026
95008Commercial——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95008Other——Aug 21, 2026
95008Residential——Aug 21, 2026
95008Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95032Residential——Aug 21, 2026
95008Residential——Aug 21, 2026

Top ZIP codes by recent activity

950081719503220951254951284

ADU types in the recent set

detached4attached2garage conversion1unknown1

Permit activity in Campbell

Igni counted 1,976 permits issued in Campbell over the last 12 months (Sep 2025 – Aug 2026) — down 6.7% on the 2,119 in the 12 months before. The forecast expects about 990 over the next 6 months.

Monthly permits issued in CampbellMonthly all permits issued in Campbell from Sep 2023 to Aug 2026, between 98 and 327 a month. The dashed forecast for Sep 2026–Feb 2027 runs from about 165 to 165 a month, with a shaded 10th–90th percentile range.02004002024202520262027Sep 2023: 136 permitsOct 2023: 140 permitsNov 2023: 135 permitsDec 2023: 98 permitsJan 2024: 188 permitsFeb 2024: 114 permitsMar 2024: 119 permitsApr 2024: 151 permitsMay 2024: 146 permitsJun 2024: 142 permitsJul 2024: 114 permitsAug 2024: 327 permitsSep 2024: 197 permitsOct 2024: 173 permitsNov 2024: 185 permitsDec 2024: 146 permitsJan 2025: 207 permitsFeb 2025: 143 permitsMar 2025: 199 permitsApr 2025: 164 permitsMay 2025: 108 permitsJun 2025: 208 permitsJul 2025: 206 permitsAug 2025: 183 permitsSep 2025: 154 permitsOct 2025: 206 permitsNov 2025: 145 permitsDec 2025: 109 permitsJan 2026: 153 permitsFeb 2026: 170 permitsMar 2026: 166 permitsApr 2026: 181 permitsMay 2026: 180 permitsJun 2026: 175 permitsJul 2026: 162 permitsAug 2026: 175 permitsSep 2026 forecast: about 165 permits (10th–90th percentile 116–188)Oct 2026 forecast: about 165 permits (10th–90th percentile 116–181)Nov 2026 forecast: about 165 permits (10th–90th percentile 107–180)Dec 2026 forecast: about 165 permits (10th–90th percentile 128–178)Jan 2027 forecast: about 165 permits (10th–90th percentile 144–176)Feb 2027 forecast: about 165 permits (10th–90th percentile 150–175)
Monthly permitsForecast (median)10th–90th percentile range

Forecast: trailing mean, typical error ±10% in backtests one to six months ahead. How we forecast

Permits issued per 12 months by permit type, with the year-over-year change and the median forecast for the coming months.
Permit typeLast 12 monthsYear over yearForecast, next 6 months
All permits1,976Down 6.7%≈ 990
Residential building566Down 41.3%≈ 234
Commercial building81—≈ 42
Trade (electrical, plumbing, mechanical)1,278Up 23.7%≈ 661
ADU56——
Monthly figures
Monthly all permits issued in Campbell; provisional months may still rise as the city publishes late records.
MonthPermits10th–90th percentile
Sep 2023136—
Oct 2023140—
Nov 2023135—
Dec 202398—
Jan 2024188—
Feb 2024114—
Mar 2024119—
Apr 2024151—
May 2024146—
Jun 2024142—
Jul 2024114—
Aug 2024327—
Sep 2024197—
Oct 2024173—
Nov 2024185—
Dec 2024146—
Jan 2025207—
Feb 2025143—
Mar 2025199—
Apr 2025164—
May 2025108—
Jun 2025208—
Jul 2025206—
Aug 2025183—
Sep 2025154—
Oct 2025206—
Nov 2025145—
Dec 2025109—
Jan 2026153—
Feb 2026170—
Mar 2026166—
Apr 2026181—
May 2026180—
Jun 2026175—
Jul 2026162—
Aug 2026175—
Sep 2026 (forecast)≈ 165116–188
Oct 2026 (forecast)≈ 165116–181
Nov 2026 (forecast)≈ 165107–180
Dec 2026 (forecast)≈ 165128–178
Jan 2027 (forecast)≈ 165144–176
Feb 2027 (forecast)≈ 165150–175

Counts are permits issued per calendar month as Campbell publishes them to its open-data feed — not a complete census; a change in what the city publishes moves them too. The current month is left out, and the most recent months are provisional. A forecast is a statistical estimate with a range, not a prediction for any project. Informational only.

How long do permits take in Campbell?

Based on 5,541 Campbell permits applied for between Sep 2023 and Jun 2026, the typical (median) permit was issued 5 days after application, and the middle half of permits took 1–32 days. One in ten took longer than 151 days.

Median and typical range (25th–75th percentile) in calendar days from application to issuance, by permit type. Segments with fewer than 30 permits are not shown.
Permit typeMedianTypical rangePermits
All permits5 days1–32 days5,541
Residential building14 days3–64 days2,295
Commercial building89 days35–181 days225
Trade (electrical, plumbing, mechanical)1 day0–8 days2,923
ADU191 days110–385 days180

Typical, not guaranteed: individual permits vary with project scope, application completeness and plan-review workload. Days are calendar days from application to issuance; applications still pending are counted as not-yet-issued rather than dropped. Informational only, not legal advice. How we calculate approval times.

Housing law — California

California mandates ministerial (by-right) approval of accessory dwelling units statewide, with a 60-day decision deadline and one ADU plus one junior ADU allowed on most single-family lots; owner-occupancy is generally not required.

SB 9 allows by-right duplexes and urban lot splits on single-family lots, and newer transit-oriented upzoning (SB 79) phases in from 2026.

ADU ministerial approval (Gov. Code Ch. 13)SB 9 (urban lot splits)SB 10 / SB 79 (transit upzoning)

Data source

Sourced from City of Campbell (MyGovernmentOnline / ArcGIS). Public records (no declared open license).

Nearby cities — California

Learn more about ADUs & building permits

Background reading on accessory dwelling units, building permits, and how Igni turns Campbell permit records into leads.

Campbell permit data — FAQ

Where does Igni get Campbell permit data?

Campbell permit data is sourced directly from City of Campbell (MyGovernmentOnline / ArcGIS) — an official government open-data feed (Public records (no declared open license)). Igni normalizes it and classifies ADU activity.

How fresh is Campbell permit data?

Igni refreshes Campbell permits continuously from the source feed, typically within about a day of filing. Headline counts reflect all permits Igni has tracked for this jurisdiction; the table shows the most recent activity.

How long does it take to get a building permit in Campbell?

Based on 5,541 Campbell permits applied for between Sep 2023 and Jun 2026, the typical (median) time from application to issuance was 5 days. The middle half of permits were issued in 1–32 days. Median by permit type: residential building permits 14 days; commercial building permits 89 days; trade (electrical, plumbing, mechanical) permits 1 day; ADU permits 191 days. These are calendar days from historical records — typical, not guaranteed; individual permits vary with scope, completeness and review workload. Not legal advice.

Is construction activity growing in Campbell?

No — Igni counted 1,976 Campbell permits issued in the 12 months to Aug 2026, down 6.7% on the 2,119 in the 12 months before. Residential building permits were down 41.3%. Igni's trailing mean forecast expects about 990 permits over the next 6 months. Counts reflect what Campbell publishes to its open-data feed, not a complete census, and the most recent months are provisional.

Does Campbell allow accessory dwelling units (ADUs)?

California mandates ministerial (by-right) approval of accessory dwelling units statewide, with a 60-day decision deadline and one ADU plus one junior ADU allowed on most single-family lots; owner-occupancy is generally not required.

Get permit leads — Campbell

Fresh, filterable residential and ADU permit leads from Campbell — delivered before your competitors even know.

Informational only, not legal advice. Headline counts reflect all permits Igni has tracked for this jurisdiction; the table shows recent activity. Housing law changes — verify current statutes before relying on this.