Igni
Anaheim · CALive now

Anaheim building & ADU permits

Recent permit activity, updated continuously.

Anaheim sits in Orange County, California — the state with the nation's most permissive statewide ADU framework, where ADUs are ministerial and SB-9 lot splits are available. Igni reads Anaheim's Accela building permits from the city's ArcGIS feed and flags SB-9/SB-10 activity alongside typed ADU classification.

Igni is tracking 1,478 residential and building permits in Anaheim, CA — including 43 classified accessory-dwelling-unit (ADU) filings. The most active ZIP is 92802. The most recent filing Igni tracked was Nov 2, 2026. All records come from City of Anaheim — Accela (ArcGIS), an official government open-data feed, and are refreshed continuously.

1478

Permits tracked

43

ADU permits

7

Distinct ZIP codes

Nov 2, 2026

Newest permit

Recent permits

A sample of the freshest permits in this jurisdiction — ZIP and city only (no street addresses).

ZIPPermit typeADU typeValuationApplied
92801Residential—$12,494Nov 2, 2026
92801Residential—$14,000Nov 2, 2026
92802Residential——Nov 2, 2026
92805Residential——Nov 2, 2026
92806Commercial—$9,464Nov 2, 2026
92804Residential—$8,342Nov 2, 2026
92801Residential—$15,600Nov 2, 2026
92805Residential——Nov 2, 2026
92805Commercial——Nov 2, 2026
92805Residential——Nov 2, 2026
92801Residential—$20,000Nov 2, 2026
92802Commercial——Nov 2, 2026
92805Residential—$9,000Nov 2, 2026
92802Residential—$14,700Nov 2, 2026
92805Residential—$10,000Nov 2, 2026
92807Commercial—$3,392Nov 2, 2026
92802Commercial—$13,568Nov 2, 2026
92802Residential——Nov 2, 2026
92804Residential—$16,000Nov 2, 2026
92802Commercial—$19,264Nov 2, 2026

Top ZIP codes by recent activity

9280229692807262928042519280524492801179

ADU types in the recent set

detached1garage conversion1jadu1

Permit activity in Anaheim

Igni counted 5,270 permits issued in Anaheim over the last 12 months (Oct 2025 – Sep 2026) — down 5.9% on the 5,598 in the 12 months before. The forecast expects about 2,634 over the next 6 months.

Monthly permits issued in AnaheimMonthly all permits issued in Anaheim from Oct 2023 to Sep 2026, between 69 and 549 a month. Aug 2026, Sep 2026 are provisional. The source's volume steps up around Feb 2008 (×1.6), likely a change in what the city publishes. The dashed forecast for Oct 2026–Mar 2027 runs from about 439 to 439 a month, with a shaded 10th–90th percentile range.02004006002024202520262027Oct 2023: 537 permitsNov 2023: 416 permitsDec 2023: 394 permitsJan 2024: 511 permitsFeb 2024: 368 permitsMar 2024: 491 permitsApr 2024: 480 permitsMay 2024: 531 permitsJun 2024: 447 permitsJul 2024: 522 permitsAug 2024: 528 permitsSep 2024: 502 permitsOct 2024: 539 permitsNov 2024: 393 permitsDec 2024: 401 permitsJan 2025: 470 permitsFeb 2025: 425 permitsMar 2025: 477 permitsApr 2025: 453 permitsMay 2025: 497 permitsJun 2025: 436 permitsJul 2025: 477 permitsAug 2025: 440 permitsSep 2025: 415 permitsOct 2025: 418 permitsNov 2025: 377 permitsDec 2025: 489 permitsJan 2026: 426 permitsFeb 2026: 359 permitsMar 2026: 549 permitsApr 2026: 487 permitsMay 2026: 381 permitsJun 2026: 466 permitsJul 2026: 463 permitsAug 2026: 69 permits (provisional)Sep 2026: 139 permits (provisional)Oct 2026 forecast: about 439 permits (10th–90th percentile 357–533)Nov 2026 forecast: about 439 permits (10th–90th percentile 356–540)Dec 2026 forecast: about 439 permits (10th–90th percentile 352–540)Jan 2027 forecast: about 439 permits (10th–90th percentile 344–532)Feb 2027 forecast: about 439 permits (10th–90th percentile 343–526)Mar 2027 forecast: about 439 permits (10th–90th percentile 344–523)
Monthly permitsForecast (median)10th–90th percentile rangeProvisional (may still rise)

The source's volume stepped up around February 2008 (×1.6) — likely a change in what the city publishes, so we don't compare year over year across it.

Forecast: trailing mean, typical error ±12% in backtests one to six months ahead. How we forecast

Permits issued per 12 months by permit type, with the year-over-year change and the median forecast for the coming months.
Permit typeLast 12 monthsYear over yearForecast, next 6 months
All permits5,270Down 5.9%≈ 2,634
Residential building1,196Down 7.5%≈ 600
Commercial building562Up 14.5%≈ 282
Trade (electrical, plumbing, mechanical)3,512Down 7.9%≈ 1,758
ADU282Down 1.7%≈ 144
Monthly figures
Monthly all permits issued in Anaheim; provisional months may still rise as the city publishes late records.
MonthPermits10th–90th percentile
Oct 2023537—
Nov 2023416—
Dec 2023394—
Jan 2024511—
Feb 2024368—
Mar 2024491—
Apr 2024480—
May 2024531—
Jun 2024447—
Jul 2024522—
Aug 2024528—
Sep 2024502—
Oct 2024539—
Nov 2024393—
Dec 2024401—
Jan 2025470—
Feb 2025425—
Mar 2025477—
Apr 2025453—
May 2025497—
Jun 2025436—
Jul 2025477—
Aug 2025440—
Sep 2025415—
Oct 2025418—
Nov 2025377—
Dec 2025489—
Jan 2026426—
Feb 2026359—
Mar 2026549—
Apr 2026487—
May 2026381—
Jun 2026466—
Jul 2026463—
Aug 2026 (provisional)69—
Sep 2026 (provisional)139—
Oct 2026 (forecast)≈ 439357–533
Nov 2026 (forecast)≈ 439356–540
Dec 2026 (forecast)≈ 439352–540
Jan 2027 (forecast)≈ 439344–532
Feb 2027 (forecast)≈ 439343–526
Mar 2027 (forecast)≈ 439344–523

Counts are permits issued per calendar month as Anaheim publishes them to its open-data feed — not a complete census; a change in what the city publishes moves them too. The current month is left out, and the most recent months are provisional. A forecast is a statistical estimate with a range, not a prediction for any project. Informational only.

How long do permits take in Anaheim?

Based on 15,625 Anaheim permits applied for between Nov 2023 and Aug 2026, the typical (median) permit was issued same day after application, and the middle half of permits took 0–55 days. One in ten took longer than 265 days.

Median and typical range (25th–75th percentile) in calendar days from application to issuance, by permit type. Segments with fewer than 30 permits are not shown.
Permit typeMedianTypical rangePermits
All permitssame day0–55 days15,625
Residential building67 days0–229 days3,598
Commercial building100 days33–258 days1,582
Trade (electrical, plumbing, mechanical)same daysame day10,445
ADU239 days147–402 days821

Typical, not guaranteed: individual permits vary with project scope, application completeness and plan-review workload. Days are calendar days from application to issuance; applications still pending are counted as not-yet-issued rather than dropped. Informational only, not legal advice. How we calculate approval times.

Housing law — California

California mandates ministerial (by-right) approval of accessory dwelling units statewide, with a 60-day decision deadline and one ADU plus one junior ADU allowed on most single-family lots; owner-occupancy is generally not required.

SB 9 allows by-right duplexes and urban lot splits on single-family lots, and newer transit-oriented upzoning (SB 79) phases in from 2026.

ADU ministerial approval (Gov. Code Ch. 13)SB 9 (urban lot splits)SB 10 / SB 79 (transit upzoning)

Anaheim ADU rules

Anaheim permits accessory dwelling units under California's ministerial, by-right framework — detached, attached, and conversion ADUs, plus a junior ADU — so a conforming application is approved without a hearing and within the state's 60-day deadline. A single-family lot can generally add one ADU plus one junior ADU; state law bars an owner-occupancy requirement for standard ADUs, while a junior ADU still requires the owner to live on the property.

Under the city's standards (Anaheim Municipal Code Section 18.38.015), a detached ADU is generally allowed up to 1,200 square feet, an attached ADU up to 50 percent of the primary dwelling or 1,200 square feet (whichever is less), and a junior ADU up to 500 square feet within the existing home. Detached units carry reduced four-foot side and rear setbacks, and no additional off-street parking is required when the unit is near transit, among the state's common exemptions.

Anaheim's signature offering is its ADU Express Program: for an eligible new detached ADU, a homeowner can use a state pre-approved (prefabricated) plan that California has already designed, reviewed, and approved, allowing same-day permitting at no design cost. The city maintains an ADUheim resource hub with guidance on the program and related incentives.

This is an informational summary — verify current rules with the city's planning/permitting department; not legal advice.

See also: California ADU law and what is an ADU?

Data source

Sourced from City of Anaheim — Accela (ArcGIS). Public records (no declared open license).

Nearby cities — California

Learn more about ADUs & building permits

Background reading on accessory dwelling units, building permits, and how Igni turns Anaheim permit records into leads.

Anaheim permit data — FAQ

Where does Igni get Anaheim permit data?

Anaheim permit data is sourced directly from City of Anaheim — Accela (ArcGIS) — an official government open-data feed (Public records (no declared open license)). Igni normalizes it and classifies ADU activity.

How fresh is Anaheim permit data?

Igni refreshes Anaheim permits continuously from the source feed, typically within about a day of filing. Headline counts reflect all permits Igni has tracked for this jurisdiction; the table shows the most recent activity.

How long does it take to get a building permit in Anaheim?

Based on 15,625 Anaheim permits applied for between Nov 2023 and Aug 2026, the typical (median) time from application to issuance was same day. The middle half of permits were issued in 0–55 days. Median by permit type: residential building permits 67 days; commercial building permits 100 days; trade (electrical, plumbing, mechanical) permits same day; ADU permits 239 days. These are calendar days from historical records — typical, not guaranteed; individual permits vary with scope, completeness and review workload. Not legal advice.

Is construction activity growing in Anaheim?

No — Igni counted 5,270 Anaheim permits issued in the 12 months to Sep 2026, down 5.9% on the 5,598 in the 12 months before. Residential building permits were down 7.5%. Igni's trailing mean forecast expects about 2,634 permits over the next 6 months. Counts reflect what Anaheim publishes to its open-data feed, not a complete census, and the most recent months are provisional.

Does Anaheim allow accessory dwelling units (ADUs)?

California mandates ministerial (by-right) approval of accessory dwelling units statewide, with a 60-day decision deadline and one ADU plus one junior ADU allowed on most single-family lots; owner-occupancy is generally not required.

Get permit leads — Anaheim

Fresh, filterable residential and ADU permit leads from Anaheim — delivered before your competitors even know.

Informational only, not legal advice. Headline counts reflect all permits Igni has tracked for this jurisdiction; the table shows recent activity. Housing law changes — verify current statutes before relying on this.